Project Construction Scheduler
North Slope , Alaska, United States
Thank you for your interest in this role, but we are no longer accepting applicants.
You can view our currently active roles here.
Job Reference 1246534
Location North Slope , Alaska, United States
Industry Infrastructure - Construction & Civil
Function Planning / Scheduling
Job Type Contract
Date Added August 19, 2024
Related Jobs
We are currently recruiting a Project Engineer to work for a globally renowned OEM specialising in freight and passenger rail products and aftermarket equipment. Experience with IoT, software development or condition monitoring systems is highly desirable.
Location- Adelaide, SA – relocation packages available from interstate
Duration- Permanent
Salary- $135,000 - $145,000 + Super
Responsibilities
- Manage project timelines, budgets, and resources effectively.
- Lead electrical design and development for manufacturing projects.
- Develop and oversee electrical systems, schematics, and layouts for production processes.
- Ensure compliance with electrical safety standards and industry regulations.
- Collaborate with cross-functional teams, including mechanical engineers, production staff, and quality control teams.
- Conduct troubleshooting, testing, and validation of electrical components.
- Implement automation and process improvement initiatives to enhance efficiency.
- Work with suppliers and vendors to source components and materials.
- Prepare detailed documentation, reports, and technical specifications.
- Bachelor’s degree in Electrical Engineering or a related field.
- 5+ years of experience in electrical engineering, manufacturing, or design engineering.
- Working knowledge of software, mechanical systems and electrical systems
- Competitive salary and benefits package.
- Opportunities for professional growth and career advancement.
- Work in the booming rail industry, with a healthy pipeline of work
Contact michael.ogborne@airswift or 0448 220 849 for more information
We are currently seeking a Consultant or Senior Consultant (Rail Operations Modelling) for our client who are expanding their Transport Advisory team. They have a diverse range of significant projects particularly within QLD and NSW.
Location- Brisbane (or Sydney)
Duration- Permanent
Responsibilities
- Provide expert advisory services, drawing on your technical expertise in operations across passenger rail, heavy haul and bus transit.
- Develop Concepts of Operations and associated operational requirements.
- Contribute to rail operational and infrastructure planning, corridor and network capacity analysis, performance assessment, and option analysis (including rolling stock)
- Provide expertise in rail operations simulation tools such as RailSys or OpenTrack
- Work closely with stakeholders to understand their needs and tailor modelling solutions accordingly (client-facing)
- Relevant Degree e.g. Engineering, Transport Planning or similar
- Proven experience in rail operations modelling within the transport sector.
- Proficiency with rail operations simulation tools such as RailSys or OpenTrack
- Previous experience operating in a consultative / client-facing role
Please contact michael.ogborne@airswift.com for any further information.
As a Mechanical Design Engineer, you will be responsible for leading the technical development of mechanical systems in rail projects, ensuring high-quality solutions that meet customer requirements and industry standards. Your role includes resolving design challenges, managing production-related technical issues, and ensuring seamless communication across departments. Fluency in French and English is essential for success in this position.
Key Responsibilities
-
Design and Development:
- Perform activities related to the GFV phase of rail projects.
- Modify and finalize FTA or drawings using CATIA V5 R19 with the SHEETMETAL module and other specified tools.
- Create and manage Change Requests (CRs) and coordinate weekly in the Configuration Control Board (CCB) meetings.
- Ensure compliance with allocated mechanical requirements and interfaces for subsystems and equipment.
-
Problem-Solving and Technical Management:
- Address technical and manufacturing issues, collaborating with the calculations department.
- Provide leadership to resolve mechanical project challenges and take informed technical decisions.
-
Coordination and Reporting:
- Liaise with manufacturing sites and ensure technical exchanges are productive.
- Use DOORS to verify and track requirements.
- Report progress in the mechanical domain, identifying and escalating issues that may impact DQC commitments.
Tools and Skills Required:
- Software Proficiency:
- CATIA V5 R19 with SHEETMETAL module
- CMT
- DOORS
- Technical Expertise:
- Design of screwed assemblies and welded joints.
- Familiarity with EI 150210, EI 150211, and DTRF150211 standards.
- Knowledge of CBS development and products such as CORADIA MAX, CORADIA LNVG, and BADEN.
Qualifications
- A minimum of 5 years of experience as a Design Engineer, with a proven track record in railway projects.
- Polyvalent and fully autonomous in design tasks.
- In-depth understanding of mechanical design principles in the rail domain.
Language Requirements
- Fluent in both French and English.
Additional Information
- This role requires daily on-site work at the Valenciennes-Petite-Forêt location.
- Effective communication and cross-functional collaboration are crucial to success.