Project Construction Scheduler I
Katy, United States
Thank you for your interest in this role, but we are no longer accepting applicants.
You can view our currently active roles here.
Job Reference 1249495
Location Katy, United States
Industry Infrastructure - Construction & Civil
Function Planning / Scheduling
Job Type Contract
Date Added October 4, 2024
Related Jobs
Location: Thurrock, UK
Contract duration: 12+ month contract
Project: Energy From Waste
Recruitment Partner: Airswift
Airswift Recruiter: Saidy Miguel
Keywords: Control & Instrumentation; Electrical; Instrument Control, Construction Drawings, Power Generation, Oil & Gas, Pharmaceutical
Our Company
We partner with our customers to deliver projects and create value over the life of their portfolio of assets. We solve complex problems by finding integrated data-centric solutions from the first stages of consulting and engineering to installation and commissioning, to the last stages of decommissioning and remediation.
Airswift are currently partnering with a global company who are currently in need of an experienced and motivated E&I Superintendent to be based in Essex or Manchester, UK. The Superintendent will join on a 12+ month contract basis and will assist the Construction Site Manager to execute and monitor all E&I works.
Responsibilities
- Assist Construction Manager to execute and monitor all E&I works
- Ensure all aspects of the works are always carried out in the safest manner
- Managing the installation and testing of Electrical, Instrumentation, Communications, Telecoms and F&G systems
- Supervise the Electrical (HT/LT/MV/LV) installation and testing works
- Supervise the Instrumentation certification and installation works
- Experience in trouble shooting of E&I system/program
- Ensure ITP Compliant and document compilation
- Experience in managing and coordinating with other Building Services
- Ensure the full compliance of Safety and Schedule requirement
- Ensure productivity of labour force against the budget man-hours
- Management of Foremen, Chargehands and crews
- Ensure materials and installation compliance to specifications
- Constant in-situ field inspection to ensure quality of works deliver
- Review Method Statement of Works and preparation of FLRA’s with crews
- Perform FAT and SAT inspection
- Perform system line check, field instrument checks and certification
- Perform calibration, functional check, Loop check and respective testing
- Perform system walk-down, line check and punch-listing
- Trouble shooting and clearing of all punch item and closure
- Experience in Pre-com & COM as well as validation of respective system
- Close coordination with other project team/trade members
- Review and interpret drawing/shop drawing
- Manage sub-contractors and monitor progress and reporting
- Handle Walk-down, Punch-listing, Clearing and Closure
- Interface and Coordinating with Client/QP representative
Qualifications and Requirements
- E&I Trade back-round
- Minimum 5-10 years’ experience post qualification
- Knowledge of Good Engineering practices
- Well versed in interpretation of Construction drawings to review and comment
- Min 5 years’ experience in Petrochemical, Oil & Gas, Pharmaceutical and Heavy Industrial Industries
- Familiar with Permit to work environment
- Familiar with FastTrack project environment
- Fit and ready for construction / Oil & Gas /site environment
- Be Independent and Pro active
- Be prepared to be fulltime and at ease in field supervision
- Be prepared to work extended hours per site requirement
- Be a teamwork player with good interpersonal skill
Apply now! If you have any questions, please contact Saidy Miguel at saidy.castelbranco@airswift.com. We look forward to hearing from you!
Location: Essex and Manchester, UK
Contract duration: 12+ month LTD contract
Project: Various projects
Recruitment Partner: Airswift
Airswift Recruiter: Saidy Miguel
Keywords: Control & Instrumentation; Electrical; Instrument Control, Construction Drawings, Power Generation, Oil & Gas, Pharmaceutical
We partner with our customers to deliver projects and create value over the life of their portfolio of assets. We solve complex problems by finding integrated data-centric solutions from the first stages of consulting and engineering to installation and commissioning, to the last stages of decommissioning and remediation.
Airswift are currently partnering with a global company who are currently in need of an experienced and motivated Construction Site Manager E&I to be based in Essex or Manchester, UK. The site manager will have an electrical background and will join their project delivery team in either location on a 12+ month LTD contract basis. This role will require a strong focus on leadership responsibilities, with the overall responsibility for the safe execution of project and site/construction implementation.
Responsibilities
- Overall responsibility for the safe execution of project and site/construction implementation
- Prepare pre-mobilisation plans and pre-construction requirements including HSE Plans, Quality Plans, RAMS and ITP’s.
- Responsible for Construction, HSEQ, Commercial and Project Controls functions of the project.
- Assess and monitor deployment of labour, supervision and equipment during the course of construction, paying particular attention to available work fronts.
- Ensure that methods of work are up to date, efficient and in accordance with company and client safety policies and Occupational Health and Safety.
- Set up, update and monitor the Project Measure and SE.
- Investigate and account for any deviations from budget man-hours / Norms on a weekly basis.
- Ensure that Take-Offs of all Construction Drawings are carried out to record and manage any changes on an ongoing basis throughout the project cycle are being carried out.
- Ensure construction installation keeps to plan and any delays are recorded and communicated to client with the respective Cause & Effect analysis
- Ensure the completion and submission of early warnings/ variations for any additional works outside of the agreed scope of work.
- Ensure Daily Field Reports are fully completed and information logged for recording site based activities.
- Monitor and Maintain project cost control and reporting, ensuring efficient work practices, time & attendance, working hours, pay rates, labour mix etc.
- Managing the manpower and resources planning and mobilisation allocation
- Attend site meetings with client and chair internal weekly meetings
- Managing the Procurement, Tender Evaluation and Selection of sub-contractors and follow through the implementation, forecasting and contract closeout.
- Managing and tracking of procurement, especially long lead items as well as bulk materials procurement and timely delivery
- Ensure the project is fully compliant with all applicable HSEQ policies and procedures.
Qualifications and Requirements
- Electrical Trade background preferred
- Proven Construction management track record with min 10 years’ experience in Power Generation, Oil & Gas or Pharmaceutical Industries
- Diverse managerial know-how in managing and coordination of multiple disciplines
- Good understanding of commercial issue and experience in handling contract disputes
- Critical human relations skills in understanding, selecting, training, developing and motivating people
- Strong Analytical, problem-solving ability with adaptive and constructive thinking
- Safety Focus, experience in the enforcement of Safety Legislation and Corporate Safety Procedures and Requirements
- Assisting in prelims, estimation, constructability review and budget proposals
- Manage the earlier procurement of the packages to fast track the progress
- Plan and establish the site setting up and respective enabling works
- Responsible for shutdown & interface management on site
- Ensure the works perform compliance to Spec, COP and Project requirement
- Track and ensure that the overall progress is on or ahead of schedule and cost
- Maintenance of daily record of all activities, labour & plant and any non-compliance of materials and workmanship
- Close field monitoring to ensure quality of works delivery
- Ensure ITP and document compilation compliance
- Review Method Statement of Works
- Manage the Builder’s works e.g. Piling, Foundation, substructure & superstructure, architectural, external & infra-structure works, etc inclusive of respective M&E services
- Manage multiple trades as well as specialist vendor/contractors
- Manage the E&I contract, Mechanical and Heavy Equipment installation
- Manage respective sub-contractors and monitor progress and reporting
- Manage Walk-down, Punch-listing, Clearing and Closure
- Interface and close coordination with Client, EP team and other project team members
- Managing the pre-commissioning and commissioning works which may include IQ/OQ
- Manage the turnover and closure of the contract.
- Fit and ready for construction / Oil & Gas site environment
- Be a Good Leader, Independent and Pro active
- Good communicator (verbal and written)
- Calm professional manner but able to make firm and timely decision
- Positive “can do” attitude and be proactive to identify & resolve management problem
- Be prepared to be fulltime and at ease in Construction Management
- Be prepared to work extended hours per site requirement
- Be a teamwork player with good interpersonal skill
The next step
Apply now! If you have any questions, please contact Saidy Miguel at saidy.castelbranco@airswift.com. We look forward to hearing from you!
Work period: Full-Time
Duration: 1 year
Location: - Boden, Sweden
Visa Sponsorship: Available
Elevate Your Career in Preservation Coordinator (HMP) with Airswift
Are you ready to take on the role of Preservation Coordinator for our client in the Green Steel/Green Hydrogen market? As a key member of our project team, you will be responsible for ensuring the safe and efficient execution of preservation and maintenance activities until handover to the client. Join us in Boden, Sweden and be a part of this exciting project!
Role Overview
- Collaborate with various departments to ensure all preservation requirements are met from equipment purchase to handover to the client.
- Implement lubrication schedules for rotating equipment as part of the Pre-Commissioning Execution Plan.
- Execute plant preservation activities and maintain accurate records in accordance with the Preservation Plan.
- Supervise a team of multi-discipline personnel to perform and maintain all preservation and maintenance activities at the site.
- Coordinate the safe and effective utilization of materials, equipment, and personnel assigned to the preservation/maintenance team.
- Analyse repair orders and coordinate resources, materials, tools, and methods required.
Skills & Qualifications
- Strong understanding of preservation and maintenance concepts, principles, and practices.
- Experience in the Oil & Gas or Power industry in a preservation or maintenance position.
- Ability to read and understand technical documents such as P&ID's, SLD's, Isometrics, GA's, and Vendor O&M manuals.
- Specific experience in machine shop operation or repair of major equipment.
- Broad technical knowledge of construction, commissioning, and completion activities.
- Proficiency in MS Office suite and ability to effectively communicate technical solutions to both engineers and non-engineers.
- Excellent organizational skills and ability to adapt to the needs of various discipline groups.
- Valid driver's license for site in Sweden.
- Fluency in English.
Education & Experience
- Engineering degree or equivalent diploma preferred.
- Experience on EPC projects in a supervisory position as a preservation or maintenance lead/coordinator.
- Experience in the Oil & Gas or Power industry in a preservation or maintenance position.
- Basic knowledge of other functions such as construction and commissioning.
About Airswift
Airswift is a global workforce solutions provider specializing in the engineering and technology sectors. With operations spanning over 70 countries, we boast a talent pool of over 9,000 contractors and 1,000 employees. Our unparalleled reach and expertise are unmatched in the industry. Learn more about Airswift at https://www.airswift.com/blog