- Industry: O&G – Telecom
- Location: Brussels, Belgium
- Start date: 03/07/2023
- End date: 29/12/2023 (renewable)
Number of position open: 4
Mission:
Tasks description by topic:
Third Party works Be proactive and be informed of all Fibre operator (3rd parties) fibre activities Regional & National tools Management
• KLIM/CLIP = collaborate with Community Relations to provide update on FOV maps
• GIPOD = VL coordination tool = analyse and proactively decide to participate or not (FOV works like deviation,…)
• OSIRIS = Brussels Coordination tool & works authorization • POWALCO = Walloon Area Coordination & Authorization tool
Works site Coordination Follow-up Participate or be represented to all coordination meeting involving Fluxs DF network Evaluate the need for this placement, deviation,…
Works site Project Preparation:
• Elaborate all project maps
• Collaborate with Project Pilot
• Introduce all permits to work request in tools
• Communicate with Community Relations for KLIM/CLIP & get a negotiator
Execution:
• Choose a contractor
• Prepare the PO
• Deliver material to Contractor (Duct, cable, Manhole,..)
• Contractor Follow-up (particpate to all onsite coordination meeting,…)
Reception:
• Onsite geographical measurment (according Engineering rules)
• Update GIS & CableScout
• See also Interruption management
• Log & follow everything I ICT Management tool
Interruption (Planned intervention) Management
• Evaluate affected services
• Choose a contractor
• Prepare the cabling & splicing works
• Negotiate a time window
• Communicate to all involved parties
• Execute and follow intervention
• Accept or not measurement after intervention
• Update GIS & CableScout
• Check from a financial pov the work statement and accept quote
• Log & follow everything I ICT Management tool
Incident Management (Inside & Outside business hours)
• Issue/Trouble diagnosis - determine root cause
• Choose a contractor
• Prepare the cabling & splicing works
• Negotiate a time window
• Communicate to all involved parties
• Excute and follow intervention
• Accept or not measurement after intervention
• Update GIS & CableScout
• Check from a financial pov the work statement and accept quote
• Make a report
• Log & follow everything I ICT Management tool
FOV Stock Management
• Cable drum (evaluate availibilities, allocate drum to a project,…)
• Duct (reservation Zuun & stock management at head contractor)
• Manholes (evaluate availibilities, allocate drum to a project,…)
• Small material management (splicing drawers, patches panels,…)
FOV DF network integrity & quality monitoring
• Degraded cables monitoring to determine replacement urgency
• Network extension opportunities (from a commercial or ICT Operations perspective)
• Cable capacity monitoring
• Network design to reach replacement objective