Construction Scheduler

Longmont, Colorado, United States

Job Reference 1237455

Location Longmont, Colorado, United States

Industry Oil & Gas - Midstream

Function Planning / Scheduling

Job Type Contract

Date Added January 25, 2024

 Responsibilities:
 
  • Will manage many projects at a Program Level for tracking and reporting.
  • Will report to multiple mid and upper-level management for their applicable asset.
  • Will assist in cost analysis application database maintenance.
  • Ability to facilitate new initiatives related to our cost control and analysis efforts.
  • Creation of Project specific and Program level cost reports, capturing the portfolio for supported Project Managers.
  • Resource for troubleshooting cost issues.
  • Will review monthly exceptions and errors in the SAP->Prism->EPM integration process.
  • Create and manage budgets and monitor spending.
  • Define, create, and maintain project work breakdown and cost breakdown structures, working closely with engineering team.
  • Track and report up-to-date construction project costs, EACs, and variances.
  • Track incurred and forecasted cost vs authorized funding and identify needed supplements, as necessary.
  • Prepare reports to lead monthly accrual and forecast meetings to update WES management teams and coordinate with accounting teams.
  • Support the preparation of monthly accruals and forecasts for all managed projects.
  • Create and maintain scope change log and ensure scope change process adherence.
  • Utilize detailed project schedules to develop cost time-phased data forecasts.
  • Develop consolidated baseline schedules which support the project execution team.
  • Track construction progress and provide periodic schedule updates to stakeholders.
  • Oversee project construction schedule to highlight any anomalies and provide detailed analysis as required.
  • Maintain highly effective and productive relationship with company Construction team, Land team, Contractor representatives, and producer contacts ensuring that all interested parties are informed and involved in planning activities as appropriate.
  • Create, maintain, and distribute routine bi-weekly and monthly reports associated with all assigned construction project expenses.
  • Prepare detailed ad-hoc reports.
  • Participate in contractor selection process by providing feedback on contractor’s previous performance.
  • Commit and take action to make sure every employee and contractor goes home safely every day.
 
Requirements:
 
  • Five (5) or more years of relevant work experience with upstream or midstream capital projects; other industrial construction acceptable.
  • Proficient with project management software applications, Ares Prism and SAP preferred but not required, Primavera P6 required.
  • Advanced skills with MS Excel, PowerPoint, Word, and Outlook.
  • Tracking of Program Level projects is a plus.
  • Desire to drive the development, implementation, and maintenance of effective cost control and scheduling programs.
  • A fundamental knowledge of production, compression, pumping, treating, processing, and produced water disposal facilities and pipeline infrastructure is preferred.
  • Understanding of industry safety principles and their application at a construction location.
  • Ability to prepare work breakdown and cost breakdown structures based on project scope, in conjunction with the Project Manager.
  • Competency in earned value management.
  • Ability to communicate analysis findings and required recovery plan activities to management through concise written reports and clear verbal/visual presentations.
  • Bachelor’s degree required.
  • Valid driver’s license with no restrictions that would prohibit driving a company vehicle.
  • Travel will be required up to 25%. Most travel will be to field locations in the Permian Basin in West Texas.
 
 
Work Schedule:
This position will work 9 hours Monday – Thursday and 4 hours on Friday. The position will work from the office Monday, Tuesday, and Thursday, then remotely on Wednesday and Friday. 
close

Don’t see a job for you? Register for our candidate portal

Sign in or register for Airswift Digital to stay updated with recommended jobs.

Visit our candidate portal