Production : ~ 75 Kbopd operated production from one FPSO (Kaminho) with 2 production subsea loops,
2 Water injection Lines and one Gas injection line ( 7 production wells, 4 WI wells, 2 GI wells).
Well performance:
- Responsible for preparing production wells first start up in term of ramp up and targets for production,
water and gas injection
- Responsible for preparing the wells start up procedures
- Responsible for developing and deploying all tools related to well monitoring and analysis including but
not limited to DOF, Gap/Prosper
- Responsible for Performing periodical prognosis and update of well potentials, either on individual basis
or taking the facilities network constraints into account and well tests results.
- Responsible to prepare the load shedding matrix taking into account all scenario for water management,
flaring management, gas management, power management, GHG management
- Responsible for Validating the definition of the Wells potential and production targets, sets in conjunction
with Reservoir and Drilling & Completions well production/injection objectives, and assists Site as
necessary to meet the objectives. Optimises and assists Site for production/injection optimisation.
- Contributes to the definition of annual production budget and closure forecast exercise for wells and
network operations.
- Participates to the development of Ramp-up strategy and develops/follows corresponding programs and
operating instructions for wells.
- Assists Site to ensure that Well Integrity is maintained
- Controls the quality of the well production data and provides relevant information to all concerned parties
contributing to the accuracy of production/injection data. Participate in well monitoring activities
- Performs diagnosis studies, in depth analysis and proposed curative actions for underperforming wells
cooperation with Reservoir, Drilling & Completion and Field Operations entities and initiates/follows
intervention requests as necessary to meet production budget.
- Provides inputs for the state of requirements of well interventions, quantifying expected costs, shortfalls
and/or oil gain for well proposals (in conjunction with Reservoir Management, Drilling & Wells and Field
Operations)
- Ensures that relevant Company Rules related to his activities are correctly implemented.
- Initiates and follows relevant derogation requests as necessary
Flow Assurance:
- Responsible for operational and technical support to Field Operation teams through Flow Assurance
studies and expertise
- Responsible for preparing required Flow Assurance documentation for Kaminho start up and operations
(Hydrate Prevention Philosophy, Pigging Philosophy, pigging procedure & pigs datasheet, preservation
sequence & procedures, Operating Envelopes, Hot oiling...).
- In collaboration with the Production Chemistry team, ensure all deposits (including sand and asphaltenes)
related flow issues are adequately addressed to minimize process upsets
- Responsible for Flow Assurance studies related to performance actions (Well performance, Reliability,
Task Forces), modification requests, and derogations requests when required
- Responsible for developing and deploying all tools necessary for flow assurance monitoring (Olga Model,
LEDA, OCW…