KEY ROLES
The SDC Piping Construction Engineer will be responsible for delivery of piping construction/installation across the SDC Topsides, with specific emphasis as follows;
- Demonstrate excellent personal HSSE leadership and HSE behaviours. Lead, by example, with regards to company’s HSE policy.
- Fulfil the role of SDC focal-point for piping construction/installation delivery, across designated areas of the platform-build including pipework Build it Tight and Build it Clean procedures.
- Actively participate in construction-related decisions; collaborate with SDC Lead Piping Construction Engineer to provide a discipline perspective to schedules, design deliverables, materials purchases, degree of shop fabrication, material delivery configuration and sequence, as well as development of any required subcontracts
BASIC SKILLS
- Basic knowledge of piping codes & standards: ASME B31.3 – process piping, API standards (esp. API 570, API 650, API 1104)
- Knowledge of: Piping drawings, P&IDs, GA drawings; Piping support and stress considerations; Hydrotesting, flushing, torquing, welding and NTD coordination.
- Understanding of piping design, fabrication, erection, hydrotesting, walkdowns, ITR close out.
- Coordinating piping installation with structural/civil, mechanical and E&I teams.
- Ability to support pre-commissioning and commissioning activities and punch list clearance.
- Deep understanding of CLIENT Construction Defined Practice and the latest international standards that assure integrity of build and construction quality
TECHNICAL QUALIFICATIONS
Minimum:
Bachelor’s degree in mechanical engineering, production engineering or industrial engineering.Desired:
A master degree or post-graduate specialization in Offshore Systems, Mechanical or production engineering is an advantage
EXPERIENCE
- A high-level of communication and interpersonal skills.
- Significant experience (5+ years) of leading piping construction, including knowledge of associated codes and practices.
- Experience of effectively interfacing and working together with Design / Construction Contractors and Operations entities.
- Experience with HSSE issues related to on-site construction activities.
- Deep understanding of CLIENT Construction Defined Practice and the latest international standards that assure integrity of build and construction quality.
RESPONSIBILITIES & OBJECTIVES
- Interface with Design and Fabrication Contractors to ensure piping constructability input is being actively considered and implemented
- Ensure effective piping material control and tracking, including identification of material shortages and management of surplus and rework to support construction progress.
- Develop and maintain all required project documentation for SDC Build-It-Tight and Build-It-Clean programs, including all associated construction preservation procedures and piping installation assurance document.
- Provide all necessary piping technical input to SDC Construction Execution Plan, Mechanical Completion Plan, Construction Work Package Plan (CWPP) and Construction Site Surveillance Plan.
- Support the development and implementation of project modernisation and transformation solutions across the project construction discipline.
- During the Execute phase, provide oversight of all piping construction activities, from start through final acceptance including Mechanical Completion Handover processes.
- Review Hydrotest packs and attend line walks to ensure all requirements within test packs including weld log has been met test criteria.
- Participate in piping system completion try-party walk downs and generate punch list in PIMS.