Qualifications & Experience:
Education: Higher education
Work Experience: 3 years or more in Oil and Gas Construction Industry
Certificate:
Valid “Welding Inspector - CSWIP 3.1.” And CSWIP BGAS Level II or NACE or ICORR certificates
Knowledge of Languages: English (fluent), Azerbaijani (fluent).
Responsibilities:
I
n accordance with the Quality Control Plan, execute the specific inspections on material, equipment and construction/installation activities on site, following relevant specified procedures, issuing the relevant Quality Records;
- Issue the relevant Quality Records and, when necessary, write and send to Quality Control Coordinator/Quality Control Manager (as applicable) non-conformances reports (where applicable the report shall be issued on PTS software);
- Verify/control the correct storage and certification of material and instrumentation calibration certificates;
- Witness/perform qualifications of coating processes;
- Check surface preparation;
- Check and record atmospheric conditions prior to starting of painting operations;
- Carry out wet and dry film thickness checks;
- Monitor observations of the correct coding cycles;
- Monitor wet film thickness;
- Verify the correct color-coding and painting;
- Perform visuals inspections;
- Perform adhesion testing;
- Perform penetration testing;
- Evaluate impact testing;
- Perform visual checks pre-blasting;
- Perform visual checks after blasting;
- Orderly collect and manage/check documents certifying test, controls and inspection documents, ensuring that all mechanical and testing related records are properly retrievable within the final As- Built dossier;
- In Case of subcontractor activities, ensure the correct implementation of the approved Quality Control Plans/ Inspection Test Plans, witnessing inspection and collecting relevant Quality Control records;
-In accordance with the Quality Control Plans, execute the specific inspections on materials, equipment and construction/installation activities on site issuing the relevant Quality Records;
- Verify welding parameters and consumables during operations
- Check availability of welding procedures (WPS/PQR) and qualifications;
- Witness mechanical test at laboratory during PQR execution;
- Check welders qualifications;
- Check the availability and suitability of the welding equipment consumables, pre-heating, welding, heat treatment, bevels, the extent of the repairs made by the various welders (taking any corrective action required), the heat treatment record diagrams;
- Ensure that all welding, heat treatment and any hardness testing are in compliance with the relevant codes and specifications;
- Perform pipes line up check, ensuring that all installed pipe/fittings are compliant to the correct specification and that the material is in accordance with the specified material traceability requirements;
- Carry out visual inspections and issues relevant reports;
- Orderly collect and manage/check documents certifying tests, controls and inspections documents, ensuring that all welding and testing related records are properly retrievable within the final As Built dossier;
- In case of subcontractor activities, ensure the correct implementation of the approved Quality Control Plans/Inspection Test Plans, witnessing inspection and collecting relevant records